There are three distinct and key process concepts in model-based design. Our iteratively built model and the managed data behind on which that model depends on allows us to produce the published results that we will require in our deliverables. It is vital to note and never skip over the fact that there are rules, systems,…
Read more
Posted by
Tench Tilghman
Feb 22, 2023
Tags Project Explorer, Grading Optimization, project template, customization, implementation, CAD Standards, Project Management
Most of us who employ Autodesk Civil 3D in production environments are familiar with the mechanics to replace External References (XREF) in our working and/or publication drawings. The Survey dept updates the existing annotation for the proposed project’s Parcel map. Survey may overwrite the previously shared XREF drawing. They may provide a separate and differently…
Read more
Posted by
Tench Tilghman
Feb 15, 2023
Tags DREF, XREF, IREF, Project Management, Data Behind, data reference, data shortcut, video, DWF, iPOD
We will wrap up the calendar year 2022 and unwrap a collection of the Top 5 Best Civil 3D Production Tips? Why not. Everyone loves a top five list. I use the production word here not the productivity one even though both do apply in this context.
This post may have a Civil 3D management and implementation bias over a classic set…
Read more
Posted by
Tench Tilghman
Dec 28, 2022
Tags Civil 3D 2023, Civil 3D 2022, Civil 3D 2021, CAD Standards, Corridors, Data Shortcut Manager, TREF, DREF, Project Management, BIM Collaborate Pro
Intentionally, I employ the US Constitution’s analogy of the Separation of Powers to talk about how civil engineers and surveyors need to systematically manage to divide and conquer resources inside and outside Civil 3D. The perspective allows us to employ the software successfully in production.
The Principals of Separation are, as they say, self-evident. The practical…
Read more
Posted by
Tench Tilghman
Nov 30, 2022
Tags implementation, Project Management, CAD Standards, naming convention, dynamic model, management
How many times in Autodesk Civil 3D do we get a complex civil engineering design or survey dataset right the first time? Almost never. This reality is a most important fact about Civil 3D. To employ Civil 3D constructively in a real-world project-based production environment, we need to plan to fail forward.
What the heck does that mean?Sounds like…
Read more
Posted by
Tench Tilghman
Sep 07, 2022
Tags iterations, DREF, design control, design state, grading, Multiple Baseline Corridors, DWF, iPOD, Project Management